跳到正文
01·Refined by Perseverance · True to Nature

Refined by Perseverance True to Nature

The patience to reclaim what others discard — and the respect to protect the world we all depend on.

MOLYFOR

Anhui Molyfor Regenerative Resources Co., Ltd.

Video · Liuxingy · CC BY-SA 4.0

02·From Solid Waste to Green Products

Turning Solid Waste into Green Products

Hazardous waste isn't a burden on the planet — it's an urban mine in the wrong place. We put it back to work in the circular economy — turning what others throw away into cleaner materials, and cutting carbon in the process.

Photo · Raffaele Nicolussi · CC BY 3.0

03·Smart Collection · Refined Regeneration

Smart Collection, Refined Regeneration

One code follows every batch of hazardous waste from pickup to processing — through dual-frequency RFID and our "IoT + Hazardous Waste" Intelligent Management Service Platform (IHWDS). Our proprietary HyFine liquid-phase hydrogen-control process re-refines waste mineral oil into high-quality base oil.

Site plan rendering

04·Four Bases, One Green Chain

Four Bases, One Green Chain

Phase I in Yi'an came online in 2023 and has run reliably for two years. Phase II in Zongyang broke ground in June 2025, while the Phase III oil-regeneration and Guangxi biomass projects advance toward pilot stage.

26 / 166
Hazardous-waste license categories / sub-types
6,000+
Waste-generating clients served
268
IoT terminals online
32
IP rights held

Site plan rendering

05·Harmony Between Humanity and Nature

Harmony Between Humanity and Nature

This is where all our work leads. Every tonne of waste we return to use brings that goal a little closer.

Progress

  • 2023

    Phase I Yi'an Center Commissioned

    This smart hazardous-waste collection and storage center, rated at 30,000 tonnes a year, has operated reliably for two years.

  • 2025 · 06

    Phase II Zongyang Industrial Park Breaks Ground

    Built under a Sinochem TCC EPC contract, with commissioning planned for January 2027.

  • 2026

    Phase III and Guangxi Projects Advance to Pilot Stage

    Waste mineral oil regeneration and resource recovery from agricultural and forestry waste, with commissioning planned for 2028.

Visit the Newsroom

Contact

Build a lasting partnership with Molyfor.

Whether it's waste disposal, buying regenerated products, co-developing an industrial park, or partnering on a project — it starts with a conversation.

Floor 301, Building 4-D1, Beidou Xingcheng, Tongguan District, Tongling, Anhui, China

0562-5850087

Contact Molyfor